Monday, April 21, 2008

Slowly moving along




The framers finished about a week ago and today the roofers finished.


The plumbers were in last week to rough in all the plumbing fixtures. Its hard to tell what is going on in the picture to the left, but thats where my urinal will be installed. On the right is the jetted tub and part of the shower in the master bath.

Wednesday, April 9, 2008

First Floor Framing



I haven't posted anything in awhile because pouring the basement floor and grading the lot aren't that exciting. Our framing crew is cruising. Second Floor will be going on tomorrow and we should have a roof on by the end of the week.

Susie and Jim have been asking me for awhile to post a pic of their home that is being built side by side with mine. I can't wait to have Ella and Leah as my neighbors.